Drawing or sample, operating conditions and key acceptance criteria.
Product family
Precision rubber seals built around fit, media and operating conditions.
PRESIS develops drawing-based sealing components for industrial equipment, where material screening and interface fit are reviewed together.

Purchasing and engineering issue
Start with the application, not an assumed component solution.
A seal can fail when the drawing fit, fluid exposure, temperature and motion are treated as separate decisions.
Materials and process boundary
Use a project-specific route.
NBR, FKM, FFKM, EPDM and other elastomer families are screened against project conditions rather than selected from a generic chart.
Final compound, performance target and test evidence depend on the agreed application requirements.
Evidence path
Use current public examples and technical references to prepare a clearer RFQ.
Related route
Fluid-control equipment
Explore the connected product or application page to keep the engineering context and RFQ path consistent.
RFQ checklist
Share the inputs that affect the decision.
- Drawing, dimensions or sample
- Medium, temperature, load, cycle and assembly details
- Target quantity and required project documents
- Acceptance criteria or available validation method
FAQ
Questions before requesting an engineering review.
What should be prepared for this RFQ?
Send the drawing or sample, application conditions, estimated quantity, key dimensions and required validation or documentation.
Can material performance be confirmed from this page?
No. The material route and validation evidence are confirmed against the specific project requirement and agreed acceptance method.
Next step
Request a human engineering review for this project.
The RFQ entry carries this page’s source and intent so the discussion starts with the right context.
